Blog
Technical articles and guides
We write for building administrators, technical directors and PSI managers. No textbook theory, just situations we encounter on the ground, what the law says and what you need to do specifically.
since 2004ANRE · IGSU · IGPRISO/IEC 27001

Start here
Three questions we receive almost weekly. The complete answer, in one article each.
„"Does my building need an ISU permit?"”The criteria in Government Decision 571/2016, by building category. What happens if the works have already been done.Read the guide„"What is the risk if the installation does not work?"”Fines up to 100,000 lei and suspension of activity. What changed through GEO 17/2026.See what the law states„"What do I check and how often?"”Ten checks that the administrator can do, without an authorized company. Plus those that cannot.Download the list
All articles

Schrack Seconet Integral central heating system: design, commissioning, troubleshooting and maintenance
Do you have a Schrack Seconet Integral fire control panel and are you looking for someone to design, commission, troubleshoot or maintain it?…
What does IDSAI mean and when the law requires one
IDSAI stands for Fire Detection, Signaling and Alarm System. It's the abbreviation you see in estimates, specifications, the ISU notice or the book...
How to obtain ISU authorization in Constanța: steps, documents, deadlines
The ISU authorization is not obtained "at the end", but is prepared from the project. Steps in order, documents in the file, what the inspector checks and where the delays come from.
BMS or Smart Home? What's the difference and what do you actually need?
They both turn on the lights and adjust the temperature from their phones. The difference is what happens when the building has 200 rooms, three chillers, and a manager who wants a…
How much does a non-compliant electrical panel cost? More than replacing it
A non-compliant electrical panel costs nothing until the day it costs everything: a shutdown of activity, a report from the inspection, or a fire that...
Wi-Fi in the hotel or office: why it doesn't work and how to design it correctly
The most common negative hotel review isn't about breakfast. It's about Wi-Fi. What's the difference between a network that can handle 200 guests and one that can handle…
Procurement through SEAP of IT and security equipment: guide for institutions in Constanta
Most IT and security equipment purchases fail not at the auction, but after: equipment delivered but not installed, without local warranty, without the authorization required by law.…
HVAC maintenance in commercial buildings: what to check, how often, and what it costs you if you skip it
A chiller that stops working in July is not a malfunction, it's a lost hotel day. What goes into a serious HVAC maintenance contract and how do you figure it out...
Risk analysis or safety data sheet? What changed in Law 333 of May 2026
GEO 37/2026 divided the units into two: those that need a risk analysis and those that draw up a safety data sheet. Plus new review deadlines…
Have you read it and it's still not clear what applies to you?
Tell us which building you manage and which systems you have installed. We will respond promptly, to the point, without sending you an offer you didn't ask for.


















































