Electrical installation without ANRE certificate? You cannot connect it legally
We are an ANRE certified company. We perform electrical installations, panels, PRAM checks and thermographic inspections in Constanța and throughout the county, with the documents remaining in your file.

A skilled person can run your cables. He may even run them well. But when it comes time to connect the installation to the network, obtain the ISU authorization, or hand over the construction book, you are asked for a document that he has no way of providing.
ANRE certificate. Without him, the work has no one to sign.
We have been called on many times to redo installations that were technically correct but impossible to legally comply with. It's an expense you could have avoided by asking just one thing before you started: „"Do you have ANRE certification?"”
ANRE authorized electrician in Constanța: what we do
- Low voltage electrical installations, up to 0.4 kV
- Electrical panels — design, execution, modernization
- PRAM checks — grounding and insulation resistance
- Thermographic inspections for panels and circuits
- Safety lighting — evacuation, anti-panic, high-risk areas
- Charging stations for electric cars, domestic and public
- KNX automation and installations for smart buildings
Each job is delivered with the appropriate measurement reports and minutes. We don't leave the jobsite leaving you to search for the papers afterwards.
PRAM checks are not a piece of paper
A measurement is taken, a report is issued, it is filed. This is what it looks like from the outside.
In reality, a loose grounding means that the residual current device may not trip in time. And a loose connection in a switchboard heats up for months before causing a fire — and shows up on thermography long before it's visible to the naked eye.
Periodic checks are mandatory. But the reason they're worth doing correctly isn't the obligation.
Why it matters that we do the rest
We are an integrator, not just an electrical installation company. The same team also provides fire detection, smoke extraction, data cabling, and video surveillance.
This means that there are no discussions like "it's not my business, it's someone else's" when something doesn't fit the interface between systems. You have a single interlocutor and a single responsible person.
How a job goes
- We come to the site and see the existing installation
- We tell you what can be recovered and what needs to be redone
- We execute, with materials and solutions chosen for the concrete building
- We measure, prepare the documents and hand them over to you
- We stay for periodic checks
Where we work
Constanta, Medgidia, Năvodari, Mangalia, Cernavodă, Ovidiu, Valu lui Traian, Hârșova and the rest of Constanta County, plus Tulcea County.
On the coast we work in Mamaia, Eforie Nord and Sud, Techirghiol, Costinești, Olimp, Neptun, Jupiter, Venus, Saturn, Vama Veche and 2 Mai.
Hotels and guesthouses on the coast have an additional problem: the season. PRAM checks, panels and emergency lighting need to be completed before opening, not in July. If you manage a lodging facility, schedule the work well in advance — we have availability in the off-season, not in the summer.
For industrial works and large objectives, we also travel outside of Dobrogea.
Frequently asked questions
What does ANRE type B certificate mean, specifically?
It is the certificate that allows the design and execution of electrical installations for use with nominal voltages up to 0.4 kV. Basically, it covers installations in homes, offices, commercial spaces, halls and most ordinary buildings. Without this certificate, the work cannot be signed and, consequently, cannot be legally connected to the network.
I already have an installation done by someone else. Can it still be saved?
In many cases, yes. We come, measure and see what has been done. If the routes and sections are correct, often all that is needed is to complete the protections, restore the panel and prepare the documents. We tell you clearly what is recoverable and what is not, before we start.
How often should PRAM checks be done?
The frequency depends on the type of installation, the environment in which it operates and the regulations applicable to the facility. In ordinary buildings the interval is usually annual or biennial; in environments with humidity, dust or corrosive agents it may be shorter. We establish the schedule together based on the actual situation, not a general rule.
Does salty sea air affect electrical installations?
Yes, significantly. Corrosion attacks contacts, terminals and connections in switchboards, especially in buildings located near the sea. It manifests itself through increased contact resistances, which lead to heating. At the seaside we recommend more frequent thermographic inspections and components with appropriate protection.
Do you also do small works on a single home?
Yes, but scheduled work takes priority. If it's an emergency, call and we'll tell you honestly how long it will take. We don't promise deadlines we can't meet.
What documents do I receive at the end of the work?
Depending on the type of work: acceptance report, PRAM measurement reports, panel diagram, thermographic report and operating instructions. For works included in the construction book, we draw up reports according to C56.
Do you have a work that needs to be legalized?
Tell us what has already been done and what documents you have. We will tell you what can be recovered and what needs to be redone.