Rack cabinets, patch panels and network organization in Constanta
A tidy rack means a network you can troubleshoot in minutes, not hours. Every port labeled, every cable in its place.

The rack is the heart of the network and, often, the most neglected place in the building: tangled cables, unlabeled ports, equipment without ventilation. When something falls, no one knows what is connected where.
GreenSoft installs new racks and reorganizes existing racks: patch panels, cable organizers, protected power, ventilation and labeling on both ends of each link. In the end, the network has a plan that even the next person understands.
We work both in new buildings, where the rack is designed together with the structured cabling, and in existing premises, where the reorganization is done in segments, without stopping the activity.
What does the service include?
- Rack cabinet selection and installation: size, ventilation, access
- Cat6/Cat6A and fiber patch panels, connected and tested
- Cable management, organizers and clean routes
- UPS power supply and protected distribution in the rack
- Labeling, port plan and as-built documentation
Why GreenSoft
The rack also serves the security systems, telephony, cameras and building automation, not just the computers. Whoever organizes it has to know them all. At GreenSoft, the same team does the cabling, the network and the CCTV, so the rack comes out coherent.
How the project is progressing
- Inventory of existing equipment and connections
- Reorganization plan or project for new rack
- Segmented execution, with testing of each moved link
- Final labeling, photos and port plan handed over to the beneficiary
For what types of goals
- Office buildings
- hotels
- clinics and offices
- halls and warehouses
- public institutions
- stores and showrooms
Send us a picture of your current rack and we'll tell you the same day what can be done and how long it takes.
Where we work
We cover the entire county of Constanta — the municipality of Constanta, Mamaia, Năvodari, Ovidiu, Agigea, Eforie, Techirghiol, Mangalia, Medgidia and Cernavodă — including the port perimeter, based on the license to work in the Port of Constanta. For larger works, we travel throughout Dobrogea.
Useful resources
- Structured Cabling: Why Cat6 is the Reasonable Minimum
- What happens if ransomware reaches the building infrastructure?
Frequently asked questions
Can the rack be reorganized without shutting down the company?
Yes. We move links one at a time, during off-peak or after-hours hours, and test each port before moving on to the next. Outages are on the order of seconds per link.
What size rack do I need?
It depends on the number of ports, active equipment and expansion reserve. Our rule of thumb: minimum 30% free space after installation and adequate ventilation for high-dissipation equipment.
Do you also do the cabling to the offices?
Yes, structured cabling and rack are one project with us. See the structured cabling page for details.
Do we receive documentation?
Each delivered rack comes with a port plan, labels on both ends, and photos of the final state, so that any subsequent intervention can start from a known situation.
Shall we discuss your project?
Free initial technical consultation and quote within 3–5 business days.









































